Blackwater - Moura System

The COALRAIL Infrastructure Program will deliver the following projects in the Blackwater–Moura System:

 

Blackwater System

Project Name 

$M's              

Aroona to Duaringa Duplication 

35 

Blackwater to Burngrove Duplication 

43 

Bluff to Blackwater Duplication 

58.5 

Callemondah – Additional Spur 

40.5 

Grantleigh to Tunnel Duplication

49

Raglan Substation - Power System Strengthening

TBA 

Rangal - Power System Strengthening

TBA

RG Tanna Coal Terminal - 3rd Loop 

18.5

RG Tanna Coal Terminal - Extension to 2nd Unloading Loop  

5

Stanwell to Wycarbah Duplication

71.5

Wallaroo - Tryphinnia - Dingo Duplication 

34.5

Westwood to Wycarbah Duplication 

34 

Wiggins Island Coal Terminal (Early Works)

22

Windah to Grantleigh Duplication 

26 

Yan Yan Passing Loop 

13 

Total Estimated Cost 

450.5

 

Moura System

Project Name

                            $M's

Byelle Angle

5

Moura line: Passing Loops

30

Total Estimated Cost 

35