Beerwah Rail Crossing Project

Completion | What does this mean?

Beerwah Rail Crossing Project

Last Updated: Friday, 11 December 2009

Beerwah Rail Crossing Project

Project Fast Facts

The Beerwah level crossing, which caused congestion and traffic snarls in Beerwah town centre, has been eliminated. A new 1.2 km road connection has been built over the rail line south of Beerwah CBD and the $67.6 million project was opened at the end of October 2009.  

  • Start Date: March 2008
  • End Date: October 2009
  • Construct a new 1.2km road bridge over the rail line
  • Two roundabouts and two signalised intersections