Main elements of the works
The second track has been constructed within the existing rail corridor and no station works were required at Helensvale, Nerang or Robina stations.
The main elements of the works were:
- Constructing a 16.6km second line on the western side of the existing track starting approximately 100m south of Helensvale Station through to Robina Station.
- New rail bridges over waterways and roads.
- Providing signals and overhead power.
- Constructing a maintenance road beside the track.
Tracklaying south of Nerang - early 2008 |
Background
The project has been planned as part of the package of upgrades on the existing rail corridor between Brisbane and Robina, which includes the Ormeau to Coomera duplication and the Salisbury to Kuraby third track.