Goonyella System

The COALRAIL Infrastructure Program is planning to deliver the following projects in the Goonyella System:

 

Project Name 

$M's

80 

2.9

33 

109.6 

 

198

16

 

190

30 

17.1 

Power Strengthening (Mindi Substation Harmonic Filters)

(included above) 

16.2

Winchester Passing Loop

7

Total Estimated Cost 

 

771.3

 

Values current as at September 2008.

 



QR
graphic Need some assistance? Contact Us