QR
SEQIPRAIL  
Projects

Caboolture to Beerburrum Duplication

Completion | What does this mean?

Caboolture to Beerburrum Duplication

Last Updated: Tuesday, 15 December 2009

Caboolture to Beerburrum Duplication

Project Fast Facts

This project involves constructing a second track between Caboolture and Beerburrum, and upgrading two stations:  Elimbah and Beerburrum.

  • Start Date: Jul 2006
  • End Date: 2009 - with minor works to follow
  • Track length: 13.7km
  • New road: 4.8km realigned
  • Bridges: 4 rail, 1 road-over-rail

spacer
spacer spacer spacer spacer spacer spacer

This page contains documentation available to the public on the development of this project.  The following documentation is in Adobe pdf format. If you don't have Adobe Reader installed you can get it by clicking here.

Audio Visual

Caboolture to Beerburrum Duplication 3D visualisation.

QR
graphic Need some assistance? Contact Us